FGS Long-duration storage
Stores intermittent, off-peak and surplus power to support stable supply, on or off grid.
XCITY PowerNode / Power & site partner program
Connect surplus power and idle space to the XCITY compute network. We deploy and operate the system. You earn power-sale revenue and site rent.
Existing site → New compute nodeProduct and deployment illustration. Actual configuration is site-specific.
02 / Architecture
A prefabricated, transportable power-to-compute system. Storage, microgrid and compute infrastructure are configured around your site’s supply, load and cooling conditions.

Stores intermittent, off-peak and surplus power to support stable supply, on or off grid.
Integrates behind-the-meter dispatch, protection, metering and settlement, with priority for your existing plant load.
Factory-built, containerized liquid-cooled AI data centers. MPOD modules span 1–3 MW; XPOD brings modules together in clusters.
03 / Deployment scale
Two deployment scales, matched to available power and site conditions.
| Specification | PowerNode M | PowerNode X |
|---|---|---|
| Facility power scale | 1–5 MW | 10–50 MW |
| Typical configuration | 1–2 MPOD + FGS | XPOD + FGS + mGrid |
| Best suited to | Industrial and logistics parks, WWTPs, CHP campuses | Heavy-industry sites, retired plants, utility-scale solar |
| Deployment | Deployment in months | Phased deployment; first phase in months |
MW figures describe facility power scale. Configuration, delivery and connection requirements depend on site assessment, engineering and approvals.
04 / Partnership
XCITY purchases agreed surplus power and pays site rent separately. Partners do not fund equipment construction.
Request a free assessment →05 / Site fit
We assess sites with existing power capacity, declining plant loads or surplus captive generation.
06 / HOW IT WORKS
You provide power and a site. XCITY handles equipment, engineering, operations and compute customers — from the first utility bill to transparent monthly settlement.

Product and deployment illustration. Actual configuration is site-specific.
Share 24 months of utility bills and a single-line diagram. Receive surplus capacity, deployable M/X scale and an earnings estimate.
Fix the M/X model, tie-in point, FGS size and settlement terms. Sign power-purchase and site agreements.
FGS and POD are factory-built and shipped in containers. XCITY handles foundations and tie-in, planning around your existing operations.
XCITY operates the POD and leases compute to customers. Power and site rent are settled monthly against transparent metering, as agreed.
24 months of utility bills, a single-line diagram, and site photos or coordinates.
0.5–5 acres of paved yard, or a suitable idle building.
Confirm power-purchase and site-rental terms, with monthly settlement as agreed.
Timelines are indicative. Assessment returns surplus capacity, deployable M/X scale and an earnings estimate. Delivery depends on site engineering and approvals.
07 / Power & site partner program
Enter your initial details to prepare an assessment email. Attach utility bills, a single-line diagram and site photos before sending.
hello@xcity.ai ↗Your email draft is ready. If your email app did not open, use the link below or copy the request.
Open email draftBased on the October 2026 XCITY PowerNode partner brief. Configuration, earnings, purchased volume, deployment timelines and terms are subject to site assessment and definitive agreements. Deployment is subject to permits, utility rules and applicable regulations.