← Products & services

XCITY PowerNode / Power & site partner program

Your surplus power.
Tomorrow’s AI compute.

Connect surplus power and idle space to the XCITY compute network. We deploy and operate the system. You earn power-sale revenue and site rent.

Illustration of modular POD data centers deployed on an industrial campusExisting site → New compute node
01 / POWERNODEPower to compute · System schematic
Surplus powerYour plant load takes priority
01FGSLong-duration storage
02mGridMicrogrid & distribution
03PODModular mobile data center
AI compute network

Product and deployment illustration. Actual configuration is site-specific.

1–5 MWPowerNode M
10–50 MWPowerNode X
10–20 yearsPartnership term

02 / Architecture

One system, from energy to intelligence.

A prefabricated, transportable power-to-compute system. Storage, microgrid and compute infrastructure are configured around your site’s supply, load and cooling conditions.

Illustration of FGS storage integrated with modular compute facilities
Storage, power distribution and compute, working together on one site.Product and deployment illustration. Actual configuration is site-specific.
01

FGS Long-duration storage

Stores intermittent, off-peak and surplus power to support stable supply, on or off grid.

Explore product →
02

mGrid Microgrid & distribution

Integrates behind-the-meter dispatch, protection, metering and settlement, with priority for your existing plant load.

03

POD Modular mobile data center

Factory-built, containerized liquid-cooled AI data centers. MPOD modules span 1–3 MW; XPOD brings modules together in clusters.

Explore product →

03 / Deployment scale

From a campus node to a compute cluster.

Two deployment scales, matched to available power and site conditions.

From a campus node to a compute cluster.
SpecificationPowerNode MPowerNode X
Facility power scale1–5 MW10–50 MW
Typical configuration1–2 MPOD + FGSXPOD + FGS + mGrid
Best suited toIndustrial and logistics parks, WWTPs, CHP campusesHeavy-industry sites, retired plants, utility-scale solar
DeploymentDeployment in monthsPhased deployment; first phase in months

MW figures describe facility power scale. Configuration, delivery and connection requirements depend on site assessment, engineering and approvals.

04 / Partnership

You bring power and space. We build and operate.

XCITY purchases agreed surplus power and pays site rent separately. Partners do not fund equipment construction.

Request a free assessment →
You provide
Agreed surplus power, deployable space and assessment information.
XCITY handles
Equipment, engineering, permits, operations, insurance and compute customers.
Transparent settlement
Dedicated meters and online data support monthly settlement.
Long-term partnership
Terms may span 10–20 years. Volume, pricing and exit provisions are set by agreement.

05 / Site fit

Existing capacity. A new purpose.

We assess sites with existing power capacity, declining plant loads or surplus captive generation.

  • 01Industrial & CHP campuses
  • 02Idle heavy-industry sites & retired plants
  • 03Utility-scale solar farms
  • 04WWTP, landfill gas & biogas projects
  • 05Cold-chain & logistics parks

06 / HOW IT WORKS

Four steps from assessment to payout.

You provide power and a site. XCITY handles equipment, engineering, operations and compute customers — from the first utility bill to transparent monthly settlement.

Illustration of MPOD modular data centers on transport trucks
MPOD / Prefab & delivery

Factory-built. Transported. Connected on site.

Product and deployment illustration. Actual configuration is site-specific.

  1. 01

    Free assessment

    Target: 2 weeks

    Share 24 months of utility bills and a single-line diagram. Receive surplus capacity, deployable M/X scale and an earnings estimate.

  2. 02

    Design & contract

    About 4–6 weeks

    Fix the M/X model, tie-in point, FGS size and settlement terms. Sign power-purchase and site agreements.

  3. 03

    Prefab & deploy

    Months

    FGS and POD are factory-built and shipped in containers. XCITY handles foundations and tie-in, planning around your existing operations.

  4. 04

    Operate & settle

    10–20 years

    XCITY operates the POD and leases compute to customers. Power and site rent are settled monthly against transparent metering, as agreed.

All you need to do

  1. 01

    Share assessment information

    24 months of utility bills, a single-line diagram, and site photos or coordinates.

  2. 02

    Set aside deployment space

    0.5–5 acres of paved yard, or a suitable idle building.

  3. 03

    Agree on terms and settlement

    Confirm power-purchase and site-rental terms, with monthly settlement as agreed.

Timelines are indicative. Assessment returns surplus capacity, deployable M/X scale and an earnings estimate. Delivery depends on site engineering and approvals.

07 / Power & site partner program

How much AI compute could your site support?

Enter your initial details to prepare an assessment email. Attach utility bills, a single-line diagram and site photos before sending.

hello@xcity.ai ↗

Opens your email app, addressed to hello@xcity.ai. Your request is submitted only when you send the email. Privacy policy ↗

Based on the October 2026 XCITY PowerNode partner brief. Configuration, earnings, purchased volume, deployment timelines and terms are subject to site assessment and definitive agreements. Deployment is subject to permits, utility rules and applicable regulations.